Air Permitting Overview

Air Permitting Overview

Air Permitting Overview. Texas Commission on Environmental Quality Small Business & Local Government Assistance Jennifer Schmidt Small Business & Local Government Assistance. Programs Offer Free and confidential technical assistance Multi-media compliance tools

Air Permitting Overview. TCEQ Permitting Process NSR Construction Authorizations Federal Operating Permits Additional permitting concerns. NSR Authorizations. 30 TAC 116.110(a) Construction Authorizations

Facility--A discrete or identifiable structure, device, item, equipment, or enclosure that constitutes or contains a stationary source(30 TAC 116.10(4)) https://texreg.s os.state.tx.us/p ublic/readtac$e xt.TacPage?sl=R &app=9&p_dir=

&p_rloc=&p_tlo c=&p_ploc=&p g=1&p_tac=&ti =30&pt=1&ch= 116&rl=110 NSR Authorizations. 30 TAC 116.110(a) De Minimis. Permit by Rule. Standard Permit.

Minor NSR Permit. NA and PSD. Graphic depiction of a pyramid representing TCEQ authorizations in an increasing emissions format. Increasing Emissions.

Air Contaminants Criteria Pollutants & precursors: Carbon Monoxide (CO), Lead (Pb), Nitrogen Dioxide (NO2), Ozone (O3), Sulfur Oxides (SOX), Particulate Matter (PM), Volatile Organic Compounds (VOC). Hazardous Air Pollutants (HAP) Quantify Emissions Actual vs. Potential.

Major vs. Minor. Major Sites*: PTE > 100 tpy of any pollutant. PTE > 10 tpy single HAP; > 25 tpy combination of HAPs. NSR Authorizations. De Minimis. Graphic depiction of a pyramid representing TCEQ

authorizations in an increasing emissions format. Permit by Rule. Standard Permit. Minor NSR Permit. NA and PSD. Increasing Emissions.

De Minimis. 30 TAC 116.110(a)(5) Rule Requirements in 30 TAC 116.119 Negligible sources. Industry or activity specific. De Minimis. No paperwork submitted Keep records. Must meet all conditions exactly.

No Violations! De Minimis. 4 routes: 30 TAC 116.119 limits. De Minimis list. Effects Screening Levels (ESL) Petition the Executive Director De Minimis

https://texreg.sos.s tate.tx.us/public/re adtac$ext.TacPage ?sl=R&app=9&p_d ir=&p_rloc=&p_tlo c=&p_ploc=&pg=1 &p_tac=&ti=30&pt =1&ch=116&rl=1 19 De Minimis List of

Facilities or Sources https://www.tceq.texas.gov/ permitting/air/guidance/ newsourcereview/list-of-de-minimisfacilities.html De Minimis Example. Paint shop that uses:. Less than 100 gallons of coating & Less than 50 gallons of solvent.

Paint shop uses 250 gallons/year (by hand). NSR Authorizations. De Minimis. Graphic depiction of a pyramid representing TCEQ authorizations in an increasing emissions format.

Permit by Rule. Standard Permit. Minor NSR Permit. NA and PSD. Increasing Emissions. Permits by Rule (PBR). 30 TAC 116.110(a)(4). Permits listed in 106

Most are industry or activity specific. Permits By Rule: 30 TAC Ch. 106 http://texreg.sos.state. tx.us/public/readtac$e xt.ViewTAC?tac_view= 4&ti=30&pt=1&ch=10 6

PBR Example 106.433 Surface Coat Facilities 106.452 Dry Abrasive Cleaning 106.227 - Soldering, Brazing, Welding General PBRs. 30 TAC 106.261 and 106.262. Facilities that do not have a PBR specific to them.

Registration required. PBR Requirements. 30 TAC 106.4 & 106.8. Emissions limits. Meet PBR version in effect at time of construction or installation. PBR Requirements. Meet all other federal, state, and

local requirements. Check for permit condition limits at site. Specific PBR Requirements. Registration vs. one liners. No renewal requirements.* Distance requirements & site approval. Must meet all conditions exactly

Registering or Claiming a PBR Register PBRs that require registration. the facility shall be registered with the commission using Form PI-7. Claim PBRs that do not require registration but must follow the requirements of the PBR rule

Voluntary Registrations If PBR does not require registration, you may still voluntarily register the PBR Fee still required PBR Example 106.433 Surface Coat Facilities 106.452 Dry Abrasive Cleaning 106.227 - Soldering, Brazing, Welding

PBR Registration. PI-7 or PI-7-CERT. 106.4 & specific PBR Checklists.. Core Data Form. Additional Technical Information Technical Information

Cover letter Introduction Process Description Process flow diagram Summary of emissions Checklists

Emissions calculations NAAQS Compliance Explanation of how you meet the rule Lab Analysis Site map Other Data as needed PBR Registration

Fast 45 days processing time. Fee required at time of registration ($450/$100) Mail the forms or Submit electronically through STEERS State of Texas Electronic Reporting System (STEERS) Why use STEERS?

Streamlines the application process Shortens the process time Immediate confirmation application has been received ePBRs & STEERS NSR Authorizations. De Minimis. Graphic depiction of a

pyramid representing TCEQ authorizations in an increasing emissions format. Permit by Rule. Standard Permit. Minor NSR Permit. NA and PSD. Increasing Emissions.

Standard Permits. 30 TAC 116.110(a)(2). Industry or activity specific. Sources above PBR limits, but below PSD or nonattainment limits. Standard Permits. Concrete Temporary Hot Batch Plants.

Mix Asphalt Plants. Rock Crushers. Boilers Oil and Gas Facilities. Standard Permits https://www.tceq.texas.gov/permitting/

air/nav/standard.html Standard Permit. PI-1S Form Checklists and spreadsheets $900 Fee Renew every 10 years . Technical Information

Cover letter Introduction Process Description Process flow diagram Summary of emissions

Checklists Emissions calculations NAAQS Compliance Explanation of how you meet the rule Lab Analysis Site map Other Data as needed

NSR Authorizations. De Minimis. Permit by Rule. Standard Permit. Minor NSR Permit. NA and PSD. Graphic depiction of a pyramid representing TCEQ authorizations in an

increasing emissions format. Increasing Emissions. Minor NSR Permits. 30 TAC 116.110(a)(1). Issued before construction. a.k.a. State Permits, Individual Permits, Case-by-Case Permits, NSR Permits.

Minor NSR Permits. Case-by-case review. Emissions, BACT, impacts evaluations. Public Participation. . Minor NSR Permit Application. PI-1 form and associated

information. Minimum $900.00 fee. Not so fast. NSR Authorizations. De Minimis. Permit by Rule. Standard Permit. Minor NSR Permit. NA and PSD.

Graphic depiction of a pyramid representing TCEQ authorizations in an increasing emissions format. Increasing Emissions. Major Source Permits. Prevention of Significant Deterioration. (PSD)

Nonattainment New Source Review. (NNSR) NSR Authorizations. De Minimis. Graphic depiction of a pyramid representing TCEQ authorizations in an increasing emissions format.

Permit by Rule. Standard Permit. Minor NSR Permit. NA and PSD. Increasing Emissions. Federal Operating Permit. Title V of the Clean Air Act. In addition to your New Source

Review authorization. Issued through TCEQ. Federal Operating Permits. NSR. Breakdown of the five levels of NSR Authorizations. D

M PBR Standard Permit M i n o r

GOP Minor NSR Permit NA & PSD SOP Title V. Comparison of the three levels

of Title Five Authorizations Minor, GOP, and SOP to the five NSR levels. Federal Operating Permit Facility vs. Site NSR Permits- Based on facility emissions Federal Title V Operating permits- based on site emissions

A site is required to obtain an operating permit if it is considered to be a major source (per 30 TAC Section 122.10). Or is a listed industry (ex. ACI) Federal Operating Permit.. Major vs. Minor In general, major sites have PTE: > 100 tpy of any pollutant. > 10 tpy single HAP; > 25 tpy combination of HAPs.

Synthetic Minor. PTE above major source levels. Actual emissions are below. Certify emissions. PI-7-CERT or APD-CERT. NSR & Title V Perspective. NSR. Breakdown of

the five levels of NSR Authorizations. D M PBR Standard Permit

M i n o r GOP Minor NSR Permit NA & PSD SOP

Title V. Comparison of the three levels of Title Five Authorizations Minor, GOP, and SOP to the five NSR levels. Additional Considerations.

Nonattainment areas. National Emission Standards for Hazardous Air Pollutants (NESHAP) New Source Performance Standards. (NSPS) Additional Considerations. Graphic depiction of a pyramid

Nonattainmen including t Areas Nonattainment areas, NESHAP and NESHAP NSPS. NSPS Nonattainment Areas. EPA NAAQS for criteria pollutants.

Areas in TX do not meet the NAAQS for Ozone. DFW (Serious) & HGB (Severe). Nonattainment Areas. Major vs. Minor & Potential to Emit. Control of NOx (Chapter 117) Control of VOC (Chapter 115) NESHAP/MACT.

National Emission Standards for Hazardous Air Pollutants. Federal Standards nationwide. Hazardous Air Pollutants. NESHAP/MACT. Title 40 CFR Part 63 & 61. Major and Minor (Area) Sources. 10/25. Comply, even if TCEQ does not

have delegation. NSPS. New Source Performance Standard. Title 40 CFR Part 60. New, modified and reconstructed sources. Summary. NSR. D

M PBR Standard Permit Minor NSR Permit NA & PSD Title V. Additional.

Comparison of the three levels of Title Five Authorizations - Minor, GOP, and SOP, the five NSR levels, and the additional considerations pyramids. M in o r GOP

Nonattainment Areas NESHAP NSPS SOP Expedited Permitting. 30 TAC Chapter 101

Pre-application meeting recommended but not required Additional Surcharge Expedited Permitting. Use form APD-EXP (STEERS). Surcharge Amounts:. Range from $500 for PBR & SP not requiring public notice (non-refundable, flat surcharge) To $20,000 for Major NSR (NA or PSD)

ePBRs & STEERS Presentation TOMORROW! Learn to: Set up an account in STEERS Submit a PBR application through STEERS Questions? Jennifer Schmidt 713-767-3549

[email protected] Small Business & Local Government Assistance. 800-447-2827. www.TexasEnviroHelp.org. D M PBR Standard

Permit Minor NSR Permit NA & PSD

Recently Viewed Presentations

  • Cut Cylinder

    Cut Cylinder

    Each of the Auxiliary Plans in the drawing will be projected from the Front Elevation, in the same way that the Plan was projected. When drawing Auxiliary Plans, the drawing will again need to be drawn at the angle that...
  • -Northern Cape Progress report on the bucket eradication

    -Northern Cape Progress report on the bucket eradication

    Northern Cape - Progress report on the bucket eradication to the Portfolio Committee 10 October 2007 Bucket eradication in formal settlements Buckets = 6,846 Funds received = R 65,2M Bucket eradication Out of 19 Municipalities only 1 Reported that Bucket...
  • Our Service System Implementation Web Meeting March 2016

    Our Service System Implementation Web Meeting March 2016

    On CBDM - Learning Days consensus was very refined. -- the event would be short (2-3 hours), topic would be GSR/Area service oriented, it would take place in March at the IBEW hall, and on Sat afternoon between meetings. On...
  • Food Package Labels

    Food Package Labels

    A serving is a measured amount of food or drink, such as one slice of bread or one cup (eight ounces) of milk. Many foods that come as a single portion actually contain multiple servings. The Nutrition Facts label on...
  • CDC Presentation

    CDC Presentation

    HRD and Partnerships Strategy. Designate a focal point for training and education . Identify training and HRD needs. Provide competency-based in-service TB training and human resource development. Establish evaluation strategies to improve existing trainings and to identify ongoing training and...
  • Induction Motor Emulation for Variable Frequency Drive Testing

    Induction Motor Emulation for Variable Frequency Drive Testing

    From simulated and experimental data a relationship was created relating a motors slip dependent rotor resistance to the emulating transformers load resistance (Rv). Where: Rr' = a motor's slip dependent rotor resistance a = the turns ratio of the transformer...
  • Module 1: Foundational Terms

    Module 1: Foundational Terms

    Big Bang - the most widely accepted theory for the origin history and structure of the universe. In broad outline, the big bang theory describes the universe as a measurable system that expands from a singular beginning of matter, energy,...
  • 2019-20 FHSAA/NFHS VOLLEYBALL RULES POWERPOINT Take Part. Get

    2019-20 FHSAA/NFHS VOLLEYBALL RULES POWERPOINT Take Part. Get

    Coaches can make changes to the roster until 10 minutes remain on the pregame clock. All rosters and lineups must be submitted to the second referee - not the scorer. The second referee shall collect team rosters at the prematch...